Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 05/16/2024 Category: County Facilities Current Phase: Construction
This 12,000 square foot three-bay facility will be a state-of-the art with hurricane impact rated bi-fold doors for additional protection. Interior build-out has started.Sheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 05/16/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .Babcock Ranch CCSO District 5 Office
Last Updated: 05/16/2024 Category: County Facilities Current Phase: Construction
The 12,000 square foot building shell has been completed by Kitson Partners of Babcock Ranch in partnership with Florida Premier Contractors. The interior work has started.Alligator Creek Maintenance Dredge
Last Updated: 05/16/2024 Category: Coastal Current Phase: Planning and Project Approval
Design, permit, dredge, and construction oversight for project certification of a maintenance dredge event of Alligator Creek channel.
Last Updated: 05/15/2024 Category: Roadway Current Phase: Planning and Project Approval
Flamingo/Edgewater Widening
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043, #014069
Last Updated: 05/14/2024 Category: Bridges Current Phase: Design Development
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Last Updated: 05/13/2024 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstructionVarious Intersection Improvements
Last Updated: 05/13/2024 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 05/13/2024 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.